Rainfall is gradually decreasing throughout the country in September every year. After the summer rainy season has been restored, projects are resumed. It is also the peak period for the production of heat shrinkable belts. Different sizes of belts are transported to all parts of the country by truck.
At the same time in the equipment assembly workshop, two large caliber vacuum sizing insulation pipe equipment (pipe diameter 960-1860 mm) has been completed in the shipment, one to Shanxi Province and one to Inner Mongolia. A small diameter 3PE (57-325MM) is being assembled and ready for transportation to Brazil 3 months later.
If you are also prepared to purchase piping anticorrosive and thermal insulation equipment, welcome to contact us.
Our web: www.hsdanticorrosion.com / My email: hsdc@qdhsd.com / Mobile: 008613963975523